Bearer Pile Assembly
The Bearer Pile Assembly is used when constructing bearer and/or joist floors, steel frames, and column structures and is ideal for extreme clay and mine substance sites. When compared to traditional piling systems, the Bearer Pile Assembly reduces site time for frames and columns and can result in significant cost savings.
- Supports all types of bearers, joints, columns, posts and above ground structures
- Adjustable top plate both during and after construction
- 220mm vertical adjustability.
- Minimum 80kN Safe Working Load